The words on a commercial fire sprinkler inspection report are easy to mix up. The form in your hand controls the labels. Contractors do not all use the same layout.

The headings below are what to ask about. They are not a diagnosis of any system, and they do not say which line items on a given report are serious.

Service requests will be referred to an independent fire sprinkler contractor holding the required state certifications and applicable local registrations for the work requested.

Words that are not interchangeable

Observation

Something the inspector saw or measured: paint on a head, a sign missing, storage close to a sprinkler, a gauge that cannot be read. An observation may or may not be written up as an item that requires correction. Read the column the form uses for “needs correction” or the equivalent.

Testing result

A number or a pass/fail from something that was operated. A main drain result, an alarm test, or a pump test belongs here. Compare it with the prior report if you have one. A change from last year is a question for the contractor, not a conclusion you should draw alone.

Deficiency

A condition the report says should be corrected. Some forms split deficiencies into categories such as critical and noncritical. If your form uses those words, ask the contractor which category each open item is in and what timeframe the report assigns. Do not promote or downgrade an item because a general article described a similar one.

Impairment

A condition in which the system, or a portion of it, cannot perform its function. A shut control valve, a system drained for work, or a pump that will not run are the situations people mean. Ohio Administrative Code 1301:7-7-09, in the text reviewed for the Ohio requirements page, requires an impairment tag in accordance with NFPA 25 when a sprinkler or standpipe system is found impaired or out of service.

Recommended follow-up

The report may name a part, a repair, a retest, or a further evaluation. That line is a recommendation. It is not proof the work has been done, and it is not a proposal. Deficiency correction is the page for getting from the written item to the work. Repair is the page when the item is a leak, a damaged head, or a failed component.

Documentation

The report, the tag at the riser, and any later note that an item was closed. After a correction, ask what gets updated: the report, the tag, a retest, or a letter the fire code official or insurer asked for.

Questions to ask before any work

  • Which open items are impairments, and is any part of the system out of service today?
  • Which items are deficiencies, and what correction is actually being proposed?
  • Does the form give a timeframe, or is the timeframe coming from the contractor’s reading of it?
  • What has to be retested, retagged, or sent to the fire code official after the work?
  • Who should receive the closeout: the owner, the insurer, the property manager, the fire code official?
  • Are any items outside sprinkler work, such as the alarm panel or the backflow device?

If the report is the reason you are calling, the decision path after a failed visit is written out on what to do after a failed inspection. The broader visit — what inspection, testing, and maintenance each mean — is on the inspection and testing page. When the next work comes due is a schedule question, on the inspection and testing schedule page.

Request fire sprinkler help

Have the report available. You do not need to interpret it first.

Service requests will be referred to an independent fire sprinkler contractor holding the required state certifications and applicable local registrations for the work requested.